All templates / SOP Pack: Plant & Transport / Telehandler SOP
Watermarked preview. The file you buy has no watermark.
Telehandler SOP
This SOP covers operating a telehandler for lifting, placing and moving materials with forks, a jib, a bucket or a hook, on construction sites, in yards and on farms.
- Main hazards and a DO NOT line up front, then 6 numbered sections
- PPE tick list, plus Always and Never lists the crew can read in ten seconds
- Step by step: before you start, doing the job, finishing up and emergencies
- Training record on the last page, to sign off everyone you train
- Also in the SOP Pack: Plant & Transport: 10 SOPs for $149.95
Good for: Civil & earthworks · Building & construction · Transport & logistics · Agriculture & farming
More like this
Daily Plant Prestart Check
A one-page daily prestart for mobile plant: fluids, structure, cab and safety gear, and an engine-running check.
Incident and Near Miss Report
Report injuries, near misses, damage and spills the same day, and track what's being done to stop them happening again.
Job Safety Analysis (JSA)
Break a job into steps, list the hazards and controls, and get the crew signed on, all on one page.